TODAY
No deadlines on this date
Sat, Oct 17
No deadlines on this date
Sun, Oct 18
No deadlines on this date
Mon, Oct 19
No deadlines on this date
Tue, Oct 20
No deadlines on this date
Vox Populi
Recent Axelar Network forum discussions
Displaying 4 forum discussions
Reopen Axelar IBC Channels to Terra
- •Proposal seeks to reopen IBC channels between Axelar and Terra after a July 2024 exploit that led to asset losses.
- •Terra has secured sufficient assets to cover the exploit and aims to restore ecosystem integrity.
- •Community members express strong support for reopening channels to restore liquidity and protocol functionality.
- •Concerns raised about uncollateralized bridged assets on Terra and the need for a thorough risk assessment before proceeding.
- •Phoenix Directive and Terra validators advocate for reopening, emphasizing collaboration and ecosystem growth.
Node not starting
- •User reports error upgrading node from 1.2.1 to 1.3.1
- •Error message shows panic with invalid app version
- •Using Go version 25.3 when encountering the error
Common Prefix as core contributors
- •Author questions lack of governance proposal for onboarding Common Prefix as core contributors
- •Raises concerns about compensation structure for new contributors
- •Asks about token allocation distribution between community and former team
- •Challenges Interop Labs' authority to decide development control
[Proposal] Update reward per epoch and rewards pool per epoch
- •A new proposal aims to update the epoch_duration to 47250 and rewards_per_epoch to 3424660000 for 20 reward pools across 10 amplifier chains.
- •The proposal is expedited and will remain open for only 24 hours for voting.
- •Community members are urged to vote if they haven't already participated.
Top Citizens
Highest rated contributors in Axelar Network
No plebeians available for this community
No plebeians available for this community
Axelar Network Key Governance Parameters
Minimum Deposit
150,000 axl
Deposit Period
1 hour
Quorum
33.4%
Voting Period
3 days
Pass Threshold
50.0%
Veto Threshold
33.4%
Validator Voting Power Distribution
Total Validators = 152Active Validators = 43
Voting power is calculated based on the number of tokens delegated to each validator.
Showing 1 through 5 of 5 proposals
| Community | Date | Prop | Title | Status | |
|---|---|---|---|---|---|
| 30 Jun 2026 | 489 | Signaling Proposal: Freeze Hacker Funds and Recustody to a Trusted Distributor at a Later Date | DEPOSIT | ||
| 28 Jun 2026 | 485 | Set instantiate_default_permission to AnyOfAddresses | VOTING | ||
| 27 Jun 2026 | 484 | Allow axelar14vps3ev03zyp2wmj89etx8rrxdxyltfy4rzl5m to upload wasm code | VOTING | ||
| 27 Jun 2026 | 483 | Allow axelar14vps3ev03zyp2wmj89etx8rrxdxyltfy4rzl5m to upload wasm code | VOTING | ||
| 12 Jun 2026 | 478 | Migrate ServiceRegistry contract | VOTING |

Axelar Network
30 Jun 2026
DEPOSIT
Signaling Proposal: Freeze Hacker Funds and Recustody to a Trusted Distributor at a Later Date
#489

Axelar Network
27 Jun 2026
VOTING
Allow axelar14vps3ev03zyp2wmj89etx8rrxdxyltfy4rzl5m to upload wasm code
#484

Axelar Network
27 Jun 2026
VOTING
Allow axelar14vps3ev03zyp2wmj89etx8rrxdxyltfy4rzl5m to upload wasm code
#483
Showing 1 through 20 of 364 proposals
| Community | Date | Prop | Title | Status | |
|---|---|---|---|---|---|
| 14 Oct 2026 | 499 | Interchain Governance Proposal | PASSED | ||
| 08 Oct 2026 | 498 | Authorize Coordinator to instantiate VotingVerifier code 64 | PASSED | ||
| 03 Sept 2026 | 497 | Migrate UNV token on Polygon | PASSED | ||
| 27 Aug 2026 | 496 | Fix UNV ITS minter configuration on Polygon | FAILED | ||
| 20 Aug 2026 | 495 | Axelar v1.5.3 Upgrade Proposal | PASSED | ||
| 01 Aug 2026 | 494 | Deactivate Moonbeam on nexus | PASSED | ||
| 22 Jul 2026 | 493 | Increase governance deposit: min_deposit to 150,000 AXL, expedited to 400,000 AXL | PASSED | ||
| 16 Jul 2026 | 492 | Rotate mainnet Amplifier CosmWasm contract admin to multisig | PASSED | ||
| 02 Jul 2026 | 491 | Accept AxelarServiceGovernance ownership of ITS and amplifier Gateways | PASSED | ||
| 02 Jul 2026 | 490 | Signaling Proposal: Freeze Hacker Funds and Recustody to a Trusted Distributor at a Later Date | PASSED | ||
| 30 Jun 2026 | 488 | Accept AxelarServiceGovernance ownership of ITS and Amplifier Gateways | FAILED | ||
| 29 Jun 2026 | 487 | Update permission-control admin for ITS, Router and Multisig | PASSED | ||
| 28 Jun 2026 | 486 | Allow the emergency multisig to upload and instantiate CosmWasm code | PASSED | ||
| 26 Jun 2026 | 482 | Rotate XRPL{Gateway,VotingVerifier,MultisigProver} admin to multisig | PASSED | ||
| 16 Jun 2026 | 481 | Rotate MultisigProver Admin for flow, sui, stellar, xrpl-evm, plume, hedera, berachain, hyperliquid, monad. | PASSED | ||
| 15 Jun 2026 | 480 | Axelar Core v1.4 Upgrade Proposal | PASSED |

Axelar Network
08 Oct 2026
PASSED
Authorize Coordinator to instantiate VotingVerifier code 64
#498

Axelar Network
22 Jul 2026
PASSED
Increase governance deposit: min_deposit to 150,000 AXL, expedited to 400,000 AXL
#493

Axelar Network
16 Jul 2026
PASSED
Rotate mainnet Amplifier CosmWasm contract admin to multisig
#492

Axelar Network
02 Jul 2026
PASSED
Accept AxelarServiceGovernance ownership of ITS and amplifier Gateways
#491

Axelar Network
02 Jul 2026
PASSED
Signaling Proposal: Freeze Hacker Funds and Recustody to a Trusted Distributor at a Later Date
#490

Axelar Network
30 Jun 2026
FAILED
Accept AxelarServiceGovernance ownership of ITS and Amplifier Gateways
#488

Axelar Network
29 Jun 2026
PASSED
Update permission-control admin for ITS, Router and Multisig
#487

Axelar Network
28 Jun 2026
PASSED
Allow the emergency multisig to upload and instantiate CosmWasm code
#486

Axelar Network
26 Jun 2026
PASSED
Rotate XRPL{Gateway,VotingVerifier,MultisigProver} admin to multisig
#482

Axelar Network
16 Jun 2026
PASSED
Rotate MultisigProver Admin for flow, sui, stellar, xrpl-evm, plume, hedera, berachain, hyperliquid, monad.
#481
...